Site survey and line audit. Our engineers visit your facility, measure available floor space, check power supply and compressed air capacity, and review the product flow from intake to pallet. You receive a written summary of constraints before any equipment is proposed.
Process design and quotation. Based on the audit, we map the sorting and packaging stages, specify machine models, and outline integration points with your existing conveyors or control systems. The quote lists every component and the expected delivery window.
Fabrication and factory testing. Machinery is built in our workshop and run with your actual product samples where possible. Sorting accuracy, belt speed, and sealing consistency are checked against the agreed specifications before anything ships.
Delivery and on-site installation. Our crew handles unloading, positioning, and mechanical assembly. We connect the line to your utilities and run a full sequence test with your operators present, adjusting settings where the real conditions differ from the factory floor.
Operator training and documentation. Your team is walked through daily operation, cleaning routines, and common fault responses. You receive a maintenance manual, spare parts list, and contact details for our support desk.
Follow-up visit and performance review. About four weeks after handover, we return to check wear points, review output data, and fine-tune calibration. This visit closes the loop and confirms the line is running at the agreed throughput.
Typical lead time from signed order to handover is 10 to 14 weeks for a standard sorting and packaging line. Custom builds with unusual product handling take longer; we confirm the schedule during the design phase, not after fabrication starts.